Go To Search
Click to Home


City Hall
P.O. Box 2315
480 East Ave. N.
Ketchum, ID  83340
Ph: 208.726.3841
Fax: 208.726.8234

WHAT'S HAPPENING

6 Stories
Posted on: May 14, 2015

Highway Detour Begins Monday May 18

Boring under Highway 75 for undergrounding power lines will cause a temporary detour, starting on Monday. Main Street's south bound lane only will be closed between First Street and Serenade Lane.

The detour begins at... Read on...

Posted on: May 13, 2015

This Week's Streetwork

Excavation in the alley between the 101 Building and First Street Building will take place between May 12 and June 1 to lower the grade of the alley. This also requires lowering the water line. Century Link will be in the... Read on...

Posted on: April 30, 2015

Utility Underground Work to Begin

Some traffic lanes will be closed starting Monday while excavators dig trenches for undergrounding power lines. Trenches will be located along River Street between Washington Avenue and Main Street, mid-block, under Main... Read on...

Posted on: April 24, 2015

City to Analyze Needs for New Civic Center

The city of Ketchum has hired Boise’s ZGA Architects to analyze space needs and prepare cost estimates for a possible new civic center. The analysis will evaluate the needs and location for city administrative offices, fire... Read on...

Posted on: April 23, 2015

Fabric Artwork Featured in New Exhibit at Ketchum City Hall

City Hall_thumb.jpg

Works by two local fabric artists will hang in City Council Chambers for a year in the second “Art in City Hall Exhibit.”

Featured artists are Leslie Rego and Janet Starr, whose works are included in collections... Read on...

Posted on: April 7, 2015

Ketchum to Spot-Spray Noxious Weeds

The city of Ketchum will begin spot-spraying noxious weeds in city rights-of-way with low-toxicity herbicide as warmer days begin.

The city will spray only specific weeds identified by the state of Idaho as “noxious.” No... Read on...